
Chilled Water Lines at CU
Project Overview
During a Thanksgiving break, Sure Shot placed two 6″ chilled water lines and one 8″ line through one 450′ bore for the University of Colorado.
Project Details
The project required fusing all of the installed pipe by certified personal. Additionally, electrofusion and GPS data was utilized to prove the fuse would withstand specs.